Friday, 28 April 2017

The R6.6 revision has been made live. Production Planning & Control


It includes following points:
  1. Cycle time master page. In order to simplify planning now you can add cycle time in masters iteself (supported by import XL as well)
  2. Add QC y,y,n,n in Product Master template file - import XL
  3. Gantt chart changes
    1. Bigger task size.
    2. Different order colors.
    3. Zoom to fit functionality.
    4. Multiple dynamic scales (Hours, days, weeks, months & years)
    5. Task name with Product code and name.
    6. Task tooltip functionality.
  4. Email notification to be sent to the concerned person during the downtime of the machine.
  5. Product wise filtering option in Reports.
    1. Consolidated order status report,
    2. Job card status report
  6.  Daily schedule report and daily production report should allow select dates and shits. Shifts by default all otherwise choice for shifts.
  7. Report for Accepted status in QC.
  8. Reports - drop down for machines/jobs as all or actually give alphabetically sorted list and date validations.
    1. Delay Report
    2. Rejected Quantity Report
    3. Dispatch Report
    4. Rejection Analysis report
    5. Reject Analysis report
    6. Accept Analysis report
    7. Machine Downtime report
  9. Raw material status report
  10. Last completed process should not be in WIP report.
Some internal enhancements to support users better and also improve performance are made as below.
  1. Superadmin user edit profile, update the username and password in signup table.
  2. Performance issue on Vendor management page.
  3. Remove scroll pagination to improve performance
  4. Urgent order <td> color and also after edit color of the order <td>
  5. Sending email to developer team after exception occurs.
  6. Support system - Adding checkbox for selecting all active and inactive companies on send email form and email sending one by one instead of sending in BCC.
  7. Support system - Showing companies who have used system in previous 10 days.

Friday, 21 April 2017

Plant Manager Release 6.5 is live now with following features. Please check it out at http://www.plantmanager.in/ 

  1. Cycle time deviation report
  2. Bypass approval process for vendors
  3. Copy cycle time for all machines
  4. Order input - split order at the time of order input as per delivery date
  5. Replace autocomplete to drop down box
  6. Consolidated schedule report - show quantity.
  7. Consolidated schedule report for large orders is a problem
  8. Add formulae sheet in each report
  9. Schedule vs production report with date selection
  10. Completed orders in selected date range report(Estimated Order Completion Report)
  11. Orders will complete in selected date range report(Order Completion Report)
  12. Each report description like tooltip
  13. Force complete - machine should show active/inactive

Monday, 10 April 2017

Plant Manager Release 6.3 is live now with following features. Please check it out at http://www.plantmanager.in/ 
  1. Inventory module incorporated in this revision which includes:
    1. Warehouse Master: Store name code and address of warehouse.
    2. GRN Form: Make entry of purchased raw material with their total cost and show the purchased quantity converted into inventory unit quantity.
    3. Raw Material Status Table: Show the total stock of raw material, allocated raw material, minimum and maximum levels of raw material at one place.
    4. Issue to Shopfloor: Issue raw material to shopfloor for particular jobcard by selecting from the GRN entries made for that Rawmaterial.
    5. Dispatch: Dispatch the quantities of Jobcard(quantities which completed their last process) to the customer
    6. Reports:
      • FGI Report(Finished goods inventory): Show the overall inventory valuation of jobcard which has completed its quantity (Raw material total cost and processing cost)
      • WIP Report(Work in progress Inventory Report) : Show process by process completed quantity Inventory Valuations.
  2. Product Master Changes
    1. Remove RM from step operations and add to product
    2. Give the input how much RM is required per quantity of that product
    3. Force reschedule after change the QC required status. & shift Pending for inspection quantity.
  3. Raw Material Master Changes:
    1. Give to selection inputs for Purchase Unit and Inventory Unit.
    2. Minimum and maximum Level.
    3. 1 PUOM Qty = ? Inventory Quantities of RM
  4. Vendor master changes
    1. Give the Selection for Outsourcing (current vendor) or RM procurement Vendor 
  5. Vendor part quantity
  6. Number creation as per settings(Jobcard and sales order number
  7. Import master template modifications.
  8. Remove machine capabilities facility
  9. Support System
  10. shift effective time shopuld be correct
  11. Alphabetical sort on every list